Capstone Copper at a Glance

184k

tonnes of copper produced in 2024

238k

tonnes of copper expected in 2025*

96%

approximate revenue from copper**

11M+

tonnes of copper in
measured and indicated mineral resources***

*based on mid-point of 2025 guidance
**based on 2024 Financial Results
***view full Mineral Reserves and Resources table

Map of North and South America

Santo Domingo

Atacama, Chile

Santo Domingo is a top quartile copper-iron-gold project in the Atacama region of Chile. Santo Domingo is Chile’s only fully-permitted greenfield project.

Mantoverde

Atacama, Chile

Mantoverde (70% ownership) is an open pit, oxide heap leach copper mine in Atacama, Chile. An expansion of the high grade sulphide was recently completed, with additional opportunities to further increase throughput ongoing.

Pinto Valley

Arizona, United States

Pinto Valley is a flagship open pit copper mine in Arizona, US, with significant district-scale opportunities surrounding the mine.

Cozamin

Zacatecas, Mexico

Cozamin is an underground copper-silver mine in Zacatecas, Mexico with a 1st quartile cost profile. The new mine plan at the site enables higher resource extraction. Exploration programs underway to pursue mine-life extension.

Mantos Blancos

Antofagasta, Chile

Mantos Blancos is an open-pit mine located in the Antofagasta region of Chile. Recent debottlenecking unlocked higher throughput. The Phase II brownfield expansion study is underway.

Explore our operations

Capstone Copper has a portfolio of long-life copper operations in the Americas and a fully permitted development project in one of the world’s most prolific copper-producing districts.

Arizona, United States


Zacatecas, Mexico


Antofagasta, Chile


Atacama, Chile


Atacama, Chile

MVDP

The Mantoverde Development Project (“MVDP”) represents a transformational expansion of our Mantoverde mine in Chile to process sulphide ore via a copper concentrator, in addition to the mine’s oxide ore processing capabilities. The $870 million project produced first copper concentrate in June 2024, achieved commercial production levels in September 2024, and ramped up to full milling rates by the end of 2024. The MVDP is expected to drive significantly higher consolidated production at lower unit costs for Capstone Copper.

Upcoming events

Presentations

Careers at Capstone

If you are looking for a purposeful, performance-driven and dynamic work environment, join us!